Main Menu

US-Highway 12 – Baraboo Bypass

From 2016 through 2017 TKC played a large role in the new Baraboo Bypass that was added into highway 12. TKC produced the concrete aggregates that went into the pavement on this project, additionally TKC manufactured all the erosion aggregate (or rip-rap) and base products.